POTOMAC DRIVE over CAMP CREEK

INSIDE COLLEGE PARK C L. · County 121, Georgia · Built 2020 · 2 Lanes · 2,047 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012153970
Year Built
2020
Length
19.8 m (65 ft)
Max Span
19.8 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
2,047
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,772,000
Total Project Cost
$8,658,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.