PRESIDENTIAL DRIVE over N FORK PEACHTREE CREEK
0.5 MI SE OF DORAVILLE · County 089, Georgia · Built 1967 · 2 Lanes · 2,047 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
33.886775, -84.261711
This bridge is in worse condition than 99% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 59 years old.
Nearby Bridges
PRES. PARKWAY over N FORK PEACHTREE CREEK
Built 1967
MARJAN DRIVE over N. FORK PTREE CRK TRIB
Built 1975
RMP I-285 CCBL-OFF over I-85- 2 I-85 RAMP
Built 1985
I-85 NBL OFF RAMP over I-285 RMP CB TO I-85 NB
Built 1985
I-85 SBL OFF RAMP over I-85 RMP SB TO I-285 CCB
Built 1987
RMP US 23 TO M9265 over I-85- I-85 RAMP
Built 1984
RMP I-85N TO I-285 over I-85- I-285- 4 RAMPS
Built 1985
I-285 over I-85- I-85 RAMP
Built 1968
I-85 NB OFF RAMP over SR407(US 23RMP TO M9265)
Built 1985
I-285 CCBL OFF RMP over 2 I-85 RMPS- 1 I-285 RMP
Built 1986
Bridge Details
- Structure #
- 000000008950720
- Year Built
- 1967
- Length
- 24.4 m (80.1 ft)
- Max Span
- 6.1 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,047
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $313,000
- Total Project Cost
- $469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.