JULIETT ROAD over SR 410 STONE MTN FREEWAY
1.5 MI NW OF STONE MTN · County 089, Georgia · Built 1967 · 2 Lanes · 2,047 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.828836, -84.178128
This bridge is in worse condition than 34.9% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 59 years old.
Nearby Bridges
SILVER HILL ROAD over STONE MOUNTAIN CREEK
Built 1965
E. PONCE DE LEON over SR 10
Built 1963
HAIRSTON ROAD over CSX RAILROAD
Built 1963
US 78 over SR 10 WBL- SR 10R TO 78W
Built 1966
SILVER HILL ROAD over SR 10 (US 78)
Built 1963
LILBURN-ST. MT. RD over STONE MOUNTAIN CREEK
Built 1962
US 78 over STONE MOUNTAIN CREEK
Built 1963
MOUNTAIN IND. BLVD over SR 410 STONE MTN FREEWAY
Built 1967
US 78 EBL over SR 236 HUGH HOWELL RD S
Built 1963
ANTEBELLUM DRIVE over CAMP CREEK
Built 1968
Bridge Details
- Structure #
- 000000008901290
- Year Built
- 1967
- Length
- 99.4 m (326.1 ft)
- Max Span
- 31.1 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 2,047
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,274,000
- Total Project Cost
- $1,911,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.