US 78 over SR 10 WBL- SR 10R TO 78W

0.9 MI N OF STONE MTN · County 089, Georgia · Built 1966 · 6 Lanes · 85,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000008901130
Year Built
1966
Reconstructed
1989
Length
56.4 m (185 ft)
Max Span
15.5 m
Width
37.4 m (122.7 ft)
Lanes
6
Daily Traffic
85,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,511,000
Total Project Cost
$2,267,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.