SILVER HILL ROAD over SR 10 (US 78)

1.2 MI N OF STONE MTN · County 089, Georgia · Built 1963 · 2 Lanes · 2,047 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008901190
Year Built
1963
Length
64.6 m (211.9 ft)
Max Span
18.9 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
2,047
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$828,000
Total Project Cost
$1,242,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.