US 78 EBL over SR 236 HUGH HOWELL RD S

1.5 MI NE OF STONE MTN · County 089, Georgia · Built 1963 · 7 Lanes · 104,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008900120
Year Built
1963
Reconstructed
1989
Length
45.7 m (149.9 ft)
Max Span
13.1 m
Width
37.8 m (124 ft)
Lanes
7
Daily Traffic
104,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,385,000
Total Project Cost
$2,078,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.