MOUNTAIN IND. BLVD over SR 410 STONE MTN FREEWAY
2.6 MI NW OF STONE MTN · County 089, Georgia · Built 1967 · 6 Lanes · 36,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.834869, -84.200147
This bridge is in worse condition than 78.3% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 59 years old.
Nearby Bridges
HAIRSTON ROAD over CSX RAILROAD
Built 1963
IDLEWOOD ROAD over SR 410 STONE MTN FREEWAY
Built 1967
JULIETT ROAD over SR 410 STONE MTN FREEWAY
Built 1967
LAWRENCEVILLE HWY. over CSX RAILROAD
Built 1955
FRANKS DRIVE over S FORK PTREE CRK TRIB
Built 1966
MOUNTAIN IND BLVD over CSX RAILROAD
Built 1977
ANTEBELLUM DRIVE over CAMP CREEK
Built 1968
E. PONCE DE LEON over SR 10
Built 1963
BROCKETT ROAD over S. FORK PEACHTREE CRK
Built 1948
US 78/ SR 410 STON over SR 859 BROCKETT ROAD
Built 1967
Bridge Details
- Structure #
- 000000008901320
- Year Built
- 1967
- Reconstructed
- 1986
- Length
- 81.4 m (267.1 ft)
- Max Span
- 22.3 m
- Width
- 25.4 m (83.3 ft)
- Lanes
- 6
- Daily Traffic
- 36,300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,181,000
- Total Project Cost
- $3,272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.