US 78/ SR 410 STON over SR 859 BROCKETT ROAD
1.2 MI N OF CLARKSTON · County 089, Georgia · Built 1967 · 6 Lanes · 106,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.825133, -84.233367
This bridge is in worse condition than 78.3% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 59 years old.
Nearby Bridges
BROCKETT ROAD over S. FORK PEACHTREE CRK
Built 1948
FRANKS DRIVE over S FORK PTREE CRK TRIB
Built 1966
MONTREAL ROAD over SR 410(US78)- SR 410 RMP
Built 1968
US 29/ SR 407 LAWR over I-285 (SR 407)
Built 2007
SR 410R TO I-285 over I-285 RAMP
Built 1995
I-285 CCBL over SR 410 RMP TO I-285 CBL
Built 1968
I-285 CBL over SR 410 STONE MT FREEWAY
Built 1967
I-285 CCBL over SR 410 STONE MT FREEWAY
Built 1967
NORTHLAKE PARKWAY over CSX RAILROAD
Built 1968
RAMP FOR I-285 CBL over US 78/ SR 410
Built 2002
Bridge Details
- Structure #
- 000000008901110
- Year Built
- 1967
- Reconstructed
- 1985
- Length
- 47.5 m (155.8 ft)
- Max Span
- 22.9 m
- Width
- 41 m (134.5 ft)
- Lanes
- 6
- Daily Traffic
- 106,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,274,000
- Total Project Cost
- $1,912,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.