I-285 CBL over SR 410 STONE MT FREEWAY

0.8 MI NW OF CLARKSTON · County 089, Georgia · Built 1967 · 5 Lanes · 194,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008900850
Year Built
1967
Reconstructed
1983
Length
80.2 m (263.1 ft)
Max Span
25.3 m
Width
29.7 m (97.4 ft)
Lanes
5
Daily Traffic
194,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,868,000
Total Project Cost
$2,803,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.