I-285 CBL over SR 410 RAMP TO I-285

0.8 MI NW OF CLARKSTON · County 089, Georgia · Built 1968 · 4 Lanes · 193,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008900870
Year Built
1968
Reconstructed
1981
Length
49.1 m (161.1 ft)
Max Span
20.1 m
Width
26 m (85.3 ft)
Lanes
4
Daily Traffic
193,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$972,000
Total Project Cost
$1,458,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.