MONTREAL ROAD over SR 410(US78)- SR 410 RMP
0.7 MI N OF CLARKSTON · County 089, Georgia · Built 1968 · 2 Lanes · 7,906 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.818406, -84.246833
This bridge is in worse condition than 34.9% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 58 years old.
Nearby Bridges
SR 410R TO I-285 over I-285 RAMP
Built 1995
I-285 CCBL over SR 410 RMP TO I-285 CBL
Built 1968
I-285 CBL over SR 410 STONE MT FREEWAY
Built 1967
I-285 CCBL over SR 410 STONE MT FREEWAY
Built 1967
RAMP FOR I-285 CBL over US 78/ SR 410
Built 2002
I-285 CBL over SR 410 RAMP TO I-285
Built 1968
CASA DRIVE over S FORK PEACHTREE CREEK
Built 1957
I-285 over S FORK PEACHTREE CREEK
Built 1970
US 29/ SR 407 LAWR over I-285 (SR 407)
Built 2007
CREEKDALE DRIVE over S FORK PEACHTREE CREEK
Built 1956
Bridge Details
- Structure #
- 000000008901810
- Year Built
- 1968
- Length
- 87.5 m (287.1 ft)
- Max Span
- 23.2 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 7,906
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,121,000
- Total Project Cost
- $1,682,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.