RAMP FOR I-285 CBL over US 78/ SR 410

0.8 MI NW OF CLARKSTON · County 089, Georgia · Built 2002 · 2 Lanes · 18,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008951630
Year Built
2002
Length
83.8 m (274.9 ft)
Max Span
44.2 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
18,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,074,000
Total Project Cost
$1,612,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.