I-285 CCBL over SR 410 RMP TO I-285 CBL

0.8 MI NW OF CLARKSTON · County 089, Georgia · Built 1968 · 5 Lanes · 213,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000008900840
Year Built
1968
Reconstructed
1981
Length
38.1 m (125 ft)
Max Span
14.9 m
Width
33.3 m (109.3 ft)
Lanes
5
Daily Traffic
213,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$888,000
Total Project Cost
$1,332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.