E. PONCE DE LEON over SR 10

0.6 MI NW OF STONE MTN · County 089, Georgia · Built 1963 · 2 Lanes · 11,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008901390
Year Built
1963
Length
72.2 m (236.9 ft)
Max Span
19.8 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
11,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$926,000
Total Project Cost
$1,389,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.