I-285 over SOUTH RIVER

9.5 MI S OF DECATUR · County 089, Georgia · Built 1966 · 10 Lanes · 152,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008901020
Year Built
1966
Reconstructed
1984
Length
59.4 m (194.9 ft)
Max Span
11.9 m
Width
49.7 m (163.1 ft)
Lanes
10
Daily Traffic
152,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,424,000
Total Project Cost
$3,636,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.