I-285 over NS RAILROAD
9.5 MI S OF DECATUR · County 089, Georgia · Built 1967 · 8 Lanes · 98,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.672561, -84.329033
This bridge is in worse condition than 34.9% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 59 years old.
Nearby Bridges
I-675R NB TO I-285 over NS RAILROAD
Built 1984
I-285R TO I-675 SB over SR413(I675R N TO I285 W)
Built 1984
I-675 SBL over I-285 (SR 407)
Built 1984
I-285R TO I-675 SB over NS RAILROAD
Built 1984
I-675 NBL over I-285 (SR 407)
Built 1984
I-285 over SOUTH RIVER TRIB
Built 1967
I-285 EAST RAMP TO over CR 142 HENRICO ROAD
Built 1984
I-285 over CR 142 HENRICO ROAD
Built 1967
I-285R TO MORELAND over CR 142 HENRICO ROAD
Built 1984
I-675R TO I-285 WB over I-285 RAMP (SR 407)
Built 1984
Bridge Details
- Structure #
- 000000008901030
- Year Built
- 1967
- Reconstructed
- 1978
- Length
- 68.6 m (225.1 ft)
- Max Span
- 28.3 m
- Width
- 42.6 m (139.8 ft)
- Lanes
- 8
- Daily Traffic
- 98,600
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,318,000
- Total Project Cost
- $3,477,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.