I-675 SBL over I-285 (SR 407)
7 MI S OF DECATUR · County 089, Georgia · Built 1984 · 2 Lanes · 60,300 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.673069, -84.328322
This bridge is in worse condition than 33.7% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 42 years old.
Nearby Bridges
I-285R TO I-675 SB over SR413(I675R N TO I285 W)
Built 1984
I-675R NB TO I-285 over NS RAILROAD
Built 1984
I-285 over NS RAILROAD
Built 1967
I-675 NBL over I-285 (SR 407)
Built 1984
I-285R TO I-675 SB over NS RAILROAD
Built 1984
I-285 over SOUTH RIVER TRIB
Built 1967
I-285 EAST RAMP TO over CR 142 HENRICO ROAD
Built 1984
I-285 over CR 142 HENRICO ROAD
Built 1967
I-285R TO MORELAND over CR 142 HENRICO ROAD
Built 1984
I-675R TO I-285 WB over I-285 RAMP (SR 407)
Built 1984
Bridge Details
- Structure #
- 000000008902900
- Year Built
- 1984
- Reconstructed
- 2022
- Length
- 137.8 m (452.1 ft)
- Max Span
- 51.8 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 60,300
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,766,000
- Total Project Cost
- $2,649,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.