I-285 EAST RAMP TO over CR 142 HENRICO ROAD

7 MI S OF DECATUR · County 089, Georgia · Built 1984 · 2 Lanes · 19,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008902840
Year Built
1984
Length
54.9 m (180.1 ft)
Max Span
26.8 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
19,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$703,000
Total Project Cost
$1,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.