I-675R NB TO I-285 over NS RAILROAD
5 MI S OF DECATUR · County 089, Georgia · Built 1984 · 2 Lanes · 16,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.672775, -84.329
This bridge is in worse condition than 34.9% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 42 years old.
Nearby Bridges
I-285 over NS RAILROAD
Built 1967
I-285R TO I-675 SB over SR413(I675R N TO I285 W)
Built 1984
I-675 SBL over I-285 (SR 407)
Built 1984
I-285R TO I-675 SB over NS RAILROAD
Built 1984
I-675 NBL over I-285 (SR 407)
Built 1984
I-285 over SOUTH RIVER TRIB
Built 1967
I-285 EAST RAMP TO over CR 142 HENRICO ROAD
Built 1984
I-285 over CR 142 HENRICO ROAD
Built 1967
I-285R TO MORELAND over CR 142 HENRICO ROAD
Built 1984
I-675R TO I-285 WB over I-285 RAMP (SR 407)
Built 1984
Bridge Details
- Structure #
- 000000008902920
- Year Built
- 1984
- Length
- 45.4 m (149 ft)
- Max Span
- 17.4 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 16,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $582,000
- Total Project Cost
- $873,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.