I-675R NB TO I-285 over NS RAILROAD

5 MI S OF DECATUR · County 089, Georgia · Built 1984 · 2 Lanes · 16,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008902920
Year Built
1984
Length
45.4 m (149 ft)
Max Span
17.4 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
16,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$582,000
Total Project Cost
$873,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.