I-285 over SUGAR CREEK OVERFLOW

8 MI S OF DECATUR · County 089, Georgia · Built 1966 · 8 Lanes · 145,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008901010
Year Built
1966
Reconstructed
1979
Length
34.7 m (113.8 ft)
Max Span
11.6 m
Width
40.9 m (134.2 ft)
Lanes
8
Daily Traffic
145,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,174,000
Total Project Cost
$1,761,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.