BOULDERCREST RD over I-285 (SR 407)
9 MI S OF DECATUR · County 089, Georgia · Built 1966 · 4 Lanes · 23,600 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.683872, -84.309906
This bridge is in worse condition than 95.2% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 60 years old.
Nearby Bridges
BOULDERCREST ROAD over SOUTH RIVER
Built 2007
I-285 over SOUTH RIVER
Built 1966
I-285 over SUGAR CREEK
Built 1966
I-285 over SUGAR CREEK OVERFLOW
Built 1966
CLIFTON CHURCH RD over SUGAR CREEK
Built 1965
CLIFTON SPRING RD over I-285 (SR 407)
Built 1967
I-675 NBL over I-285 (SR 407)
Built 1984
CONSTITUTION ROAD over ENTRENCHMENT CREEK
Built 1958
I-675 SBL over I-285 (SR 407)
Built 1984
I-285R TO I-675 SB over SR413(I675R N TO I285 W)
Built 1984
Bridge Details
- Structure #
- 000000008901480
- Year Built
- 1966
- Length
- 75.3 m (247 ft)
- Max Span
- 21.9 m
- Width
- 22.1 m (72.5 ft)
- Lanes
- 4
- Daily Traffic
- 23,600
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,491,000
- Total Project Cost
- $2,237,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.