I-75 MANAGED LANES over ROSWELL ROAD
IN EAST MARIETTA · County 067, Georgia · Built 2018 · 2 Lanes · 224,470 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.950867, -84.516783
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 8 years old.
Nearby Bridges
I-75 over ROSWELL ROAD
Built 1967
GRESHAM ROAD over I-75
Built 1990
I-75 MANAGED LANES over BANBERRY ROAD
Built 2017
I-75 over CR 1043 BANBERRY ROAD
Built 1965
I-75 MANAGED LANES over DETENTION POND
Built 2017
I-75 over SR 120 LOOP
Built 1967
I-75 MANAGED LANES over NORTH MARIETTA PARKWAY
Built 2018
I-75 RAMP TO SR120 over I-75 MANAGED LANES
Built 2017
SR 120 LOOP over SOPE CREEK TRIB
Built 1969
SR 120 LOOP over I-75 + (1) I-75 RAMP
Built 1965
Bridge Details
- Structure #
- 000000006753440
- Year Built
- 2018
- Length
- 41.1 m (134.8 ft)
- Max Span
- 41.1 m
- Width
- 14.4 m (47.2 ft)
- Lanes
- 2
- Daily Traffic
- 224,470
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,988,000
- Total Project Cost
- $17,982,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.