SR 120 LOOP over I-75 + (1) I-75 RAMP
IN SOUTH EAST MARIETTA · County 067, Georgia · Built 1965 · 9 Lanes · 32,922 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.941172, -84.504481
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 61 years old.
Nearby Bridges
I-75 RAMP TO SR120 over I-75 MANAGED LANES
Built 2017
SR 120 LOOP over ROTTENWOOD CREEK TRIB.
Built 1969
I-75 MANAGED LANES over DETENTION POND
Built 2017
I-75 over CR 1043 BANBERRY ROAD
Built 1965
I-75 MANAGED LANES over S. MARIETTA PKWY RAMP
Built 2017
I-75 MANAGED LANES over BANBERRY ROAD
Built 2017
BARCLAY ROAD over ROTTENWOOD CREEK
Built 1961
I-75 over ROSWELL ROAD
Built 1967
I-75 MANAGED LANES over ROSWELL ROAD
Built 2018
US 41/ SR 3 over ROTTENWOOD CREEK
Built 1936
Bridge Details
- Structure #
- 000000006700470
- Year Built
- 1965
- Reconstructed
- 1990
- Length
- 89.3 m (293 ft)
- Max Span
- 26.8 m
- Width
- 41.8 m (137.1 ft)
- Lanes
- 9
- Daily Traffic
- 32,922
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,330,000
- Total Project Cost
- $4,996,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.