SR 120 LOOP over I-75 + (1) I-75 RAMP

IN SOUTH EAST MARIETTA · County 067, Georgia · Built 1965 · 9 Lanes · 32,922 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006700470
Year Built
1965
Reconstructed
1990
Length
89.3 m (293 ft)
Max Span
26.8 m
Width
41.8 m (137.1 ft)
Lanes
9
Daily Traffic
32,922
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,330,000
Total Project Cost
$4,996,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.