I-75 RAMP TO SR120 over I-75 MANAGED LANES

2.7 MI E OF MARIETTA · County 067, Georgia · Built 2017 · 1 Lanes · 2,060 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006753410
Year Built
2017
Length
48.8 m (160.1 ft)
Max Span
48.8 m
Width
14.2 m (46.6 ft)
Lanes
1
Daily Traffic
2,060
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,208,000
Total Project Cost
$21,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.