I-75 MANAGED LANES over BANBERRY ROAD
IN MARIETTA · County 067, Georgia · Built 2017 · 2 Lanes · 6,650 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.945483, -84.512183
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 9 years old.
Nearby Bridges
I-75 over CR 1043 BANBERRY ROAD
Built 1965
I-75 MANAGED LANES over DETENTION POND
Built 2017
I-75 RAMP TO SR120 over I-75 MANAGED LANES
Built 2017
I-75 over ROSWELL ROAD
Built 1967
I-75 MANAGED LANES over ROSWELL ROAD
Built 2018
SR 120 LOOP over I-75 + (1) I-75 RAMP
Built 1965
SR 120 LOOP over ROTTENWOOD CREEK TRIB.
Built 1969
GRESHAM ROAD over I-75
Built 1990
BARCLAY ROAD over ROTTENWOOD CREEK
Built 1961
I-75 MANAGED LANES over S. MARIETTA PKWY RAMP
Built 2017
Bridge Details
- Structure #
- 000000006753430
- Year Built
- 2017
- Length
- 51.2 m (168 ft)
- Max Span
- 51.2 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 6,650
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $14,918,000
- Total Project Cost
- $22,377,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.