I-75 MANAGED LANES over DETENTION POND

IN MARIETTA · County 067, Georgia · Built 2017 · 2 Lanes · 6,650 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006753420
Year Built
2017
Length
128 m (419.9 ft)
Max Span
42.7 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
6,650
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$37,296,000
Total Project Cost
$55,944,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.