I-75 over SR 120 LOOP

IN EAST MARIETTA · County 067, Georgia · Built 1967 · 10 Lanes · 236,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006700740
Year Built
1967
Reconstructed
1990
Length
58.8 m (192.9 ft)
Max Span
15.2 m
Width
52.3 m (171.6 ft)
Lanes
10
Daily Traffic
236,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,399,000
Total Project Cost
$3,599,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.