WADE GREEN ROAD over I-75

2.5 MI NE OF KENNESAW · County 067, Georgia · Built 1976 · 4 Lanes · 31,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006701220
Year Built
1976
Length
123.4 m (404.9 ft)
Max Span
44.2 m
Width
28.8 m (94.5 ft)
Lanes
4
Daily Traffic
31,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,446,000
Total Project Cost
$3,668,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.