SHILOH ROAD over I-75

2.4 MI NE OF KENNESAW · County 067, Georgia · Built 1975 · 2 Lanes · 20,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006701300
Year Built
1975
Length
123.1 m (403.9 ft)
Max Span
40.2 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
20,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,579,000
Total Project Cost
$2,368,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.