I-75 (SBL) over CR 160 STEVE FREY ROAD

2.4 MI NE OF KENNESAW · County 067, Georgia · Built 1976 · 3 Lanes · 47,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006700860
Year Built
1976
Length
101.8 m (334 ft)
Max Span
37.5 m
Width
19.3 m (63.3 ft)
Lanes
3
Daily Traffic
47,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.