SKIP SPANN CONN over I-75

2.3 MI E OF KENNESAW · County 067, Georgia · Built 2016 · 4 Lanes · 2,047 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006753580
Year Built
2016
Length
126.8 m (416 ft)
Max Span
42.4 m
Width
32.3 m (106 ft)
Lanes
4
Daily Traffic
2,047
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$37,000,000
Total Project Cost
$55,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.