CHASTAIN ROAD over I-75

2.3 MI E OF KENNESAW · County 067, Georgia · Built 1975 · 6 Lanes · 32,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006701330
Year Built
1975
Reconstructed
2004
Length
95.4 m (313 ft)
Max Span
30.5 m
Width
36.1 m (118.4 ft)
Lanes
6
Daily Traffic
32,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,557,000
Total Project Cost
$3,836,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.