HICKORY GROVE ROAD over I-75

2.8 MI NORTH OF KENNESAW · County 067, Georgia · Built 2016 · 6 Lanes · 17,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006753260
Year Built
2016
Length
128.6 m (421.9 ft)
Max Span
45.4 m
Width
19.7 m (64.6 ft)
Lanes
6
Daily Traffic
17,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$37,444,000
Total Project Cost
$56,166,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.