INTERSTATE 95 over WORDIN AVENUE NO. 2
0.7 MI S OF ROUTE 8 · County 001, Connecticut · Built 1959 · 8 Lanes · 125,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
41.166731, -73.205167
This bridge is in worse condition than 31.3% of bridges in County 001. The average bridge in Connecticut is 0 years old; this one is 67 years old.
Nearby Bridges
INTERSTATE-95 over METRO NORTH & CITY STS
Built 1999
INTERSTATE-95 over HOWARD AVENUE
Built 1959
INTERSTATE-95 over HANCOCK AVENUE
Built 1959
INTERSTATE-95 over BOSTWICK AVE
Built 2006
INTERSTATE-95 over ROUTE 130 (FAIRFIELD AV)
Built 2006
INTERSTATE 95 over MYRTLE AVENUE NO. 1
Built 1958
I-95 SB TR 804 over I-95 RAMP & LOCAL AVEs
Built 2002
ROUTE 8 NB & TR 80 over I-95 S FRONTAGE RD S.AVE
Built 1999
ROUTE 8 SOUTHBOUND over ROUTE 8 SB RAMP 126
Built 1968
INTERSTATE 95 over METRO-NORTH RAILROAD
Built 2006
Bridge Details
- Structure #
- 00104
- Year Built
- 1959
- Reconstructed
- 2006
- Length
- 31.1 m (102 ft)
- Max Span
- 29.3 m
- Width
- 50 m (164 ft)
- Lanes
- 8
- Daily Traffic
- 125,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.