INTERSTATE-95 over ROUTE 130 (FAIRFIELD AV)

INTERSTATE-95 EXIT NO. 25 · County 001, Connecticut · Built 2006 · 7 Lanes · 110,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00100
Year Built
2006
Length
57.1 m (187.3 ft)
Max Span
54.9 m
Width
50 m (164 ft)
Lanes
7
Daily Traffic
110,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.