INTERSTATE-95 over HANCOCK AVENUE
1.0 MI S OF ROUTE 8 · County 001, Connecticut · Built 1959 · 7 Lanes · 129,100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
41.166244, -73.21045
This bridge is in worse condition than 31.3% of bridges in County 001. The average bridge in Connecticut is 0 years old; this one is 67 years old.
Nearby Bridges
INTERSTATE-95 over HOWARD AVENUE
Built 1959
INTERSTATE-95 over BOSTWICK AVE
Built 2006
INTERSTATE 95 over WORDIN AVENUE NO. 2
Built 1959
INTERSTATE-95 over METRO NORTH & CITY STS
Built 1999
INTERSTATE-95 over ROUTE 130 (FAIRFIELD AV)
Built 2006
INTERSTATE 95 over METRO-NORTH RAILROAD
Built 2006
INTERSTATE-95 over COMMERCE DRIVE
Built 1959
INTERSTATE-95 over ASH CREEK
Built 2003
COMMERCE DRIVE over ASH CREEK
Built 1950
INTERSTATE-95 over COOLIDGE STREET
Built 1958
Bridge Details
- Structure #
- 00102
- Year Built
- 1959
- Reconstructed
- 2006
- Length
- 25.3 m (83 ft)
- Max Span
- 23.8 m
- Width
- 53 m (173.9 ft)
- Lanes
- 7
- Daily Traffic
- 129,100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.