JOSEPHINE ST. over I 70 ML
300 FT E of YORK ST · County 031, Colorado · Built 2020 · 3 Lanes · 5,970 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 9 | Excellent |
Location
39.780081, -104.958219
This bridge is in worse condition than 18.8% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 6 years old.
Nearby Bridges
YORK STREET over I70 ML
Built 2021
CLAYTON STREET over I 70 ML
Built 2019
COLUMBINE STREET over I 70 ML
Built 2019
FILLMORE ST. over I 70 ML
Built 2020
STEELE ST. over I 70 ML
Built 2020
I70 EBND ML over BRIGHTON BLVD
Built 2022
I70 WBND ML over BRIGHTON BLVD
Built 2021
COOK STREET over I70 ML
Built 2021
YORK STREET over GREENWAY CHANNEL
Built 2020
BRIGHTON BLVD over RACE COURT
Built 2018
Bridge Details
- Structure #
- E-17-AEZ
- Year Built
- 2020
- Length
- 61 m (200.1 ft)
- Max Span
- 28.5 m
- Width
- 18.3 m (60 ft)
- Lanes
- 3
- Daily Traffic
- 5,970
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.