STEELE ST. over I 70 ML
0.47 MI W of CO BLVD · County 031, Colorado · Built 2020 · 7 Lanes · 19,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
39.780386, -104.950139
This bridge is in worse condition than 26.5% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 6 years old.
Nearby Bridges
COOK STREET over I70 ML
Built 2021
FILLMORE ST. over I 70 ML
Built 2020
COLUMBINE STREET over I 70 ML
Built 2019
CLAYTON STREET over I 70 ML
Built 2019
MONROE STREET over I 70 ML
Built 2020
JOSEPHINE ST. over I 70 ML
Built 2020
SH 2 COLO. BLVD. over I70 ML
Built 2020
YORK STREET over I70 ML
Built 2021
SH 2 ML over UP RR RTD LR
Built 2002
YORK STREET over GREENWAY CHANNEL
Built 2020
Bridge Details
- Structure #
- E-17-AEO
- Year Built
- 2020
- Length
- 61.9 m (203.1 ft)
- Max Span
- 29.5 m
- Width
- 34.7 m (113.8 ft)
- Lanes
- 7
- Daily Traffic
- 19,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.