STEELE ST. over I 70 ML

0.47 MI W of CO BLVD · County 031, Colorado · Built 2020 · 7 Lanes · 19,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
E-17-AEO
Year Built
2020
Length
61.9 m (203.1 ft)
Max Span
29.5 m
Width
34.7 m (113.8 ft)
Lanes
7
Daily Traffic
19,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.