CLAYTON STREET over I 70 ML
INT OF I70 AND CLAYTON · County 031, Colorado · Built 2019 · 2 Lanes · 5,970 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 9 | Excellent |
Location
39.780164, -104.954208
This bridge is in worse condition than 26.5% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 7 years old.
Nearby Bridges
COLUMBINE STREET over I 70 ML
Built 2019
FILLMORE ST. over I 70 ML
Built 2020
JOSEPHINE ST. over I 70 ML
Built 2020
STEELE ST. over I 70 ML
Built 2020
YORK STREET over I70 ML
Built 2021
COOK STREET over I70 ML
Built 2021
MONROE STREET over I 70 ML
Built 2020
YORK STREET over GREENWAY CHANNEL
Built 2020
I70 EBND ML over BRIGHTON BLVD
Built 2022
SH 2 COLO. BLVD. over I70 ML
Built 2020
Bridge Details
- Structure #
- E-17-AEL-2
- Year Built
- 2019
- Length
- 69.7 m (228.7 ft)
- Max Span
- 34.9 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 5,970
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.