I70 EBND ML over BRIGHTON BLVD

1.2 MI E of I25 · County 031, Colorado · Built 2022 · 5 Lanes · 73,000 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
E-17-AEV
Year Built
2022
Length
43.2 m (141.7 ft)
Max Span
20.1 m
Width
26.5 m (86.9 ft)
Lanes
5
Daily Traffic
73,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.