I70 WBND ML over BRIGHTON BLVD

1.2 MI E OF I25 · County 031, Colorado · Built 2021 · 4 Lanes · 83,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
E-17-AEU
Year Built
2021
Length
43.2 m (141.7 ft)
Max Span
19.8 m
Width
26.5 m (86.9 ft)
Lanes
4
Daily Traffic
83,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.