FILLMORE ST. over I 70 ML
900 FT W of STEELE ST · County 031, Colorado · Built 2020 · 3 Lanes · 5,970 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.780081, -104.953028
This bridge is in worse condition than 18.8% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 6 years old.
Nearby Bridges
COLUMBINE STREET over I 70 ML
Built 2019
CLAYTON STREET over I 70 ML
Built 2019
STEELE ST. over I 70 ML
Built 2020
JOSEPHINE ST. over I 70 ML
Built 2020
COOK STREET over I70 ML
Built 2021
YORK STREET over I70 ML
Built 2021
MONROE STREET over I 70 ML
Built 2020
SH 2 COLO. BLVD. over I70 ML
Built 2020
YORK STREET over GREENWAY CHANNEL
Built 2020
SH 2 ML over UP RR RTD LR
Built 2002
Bridge Details
- Structure #
- E-17-AEN
- Year Built
- 2020
- Length
- 77.8 m (255.2 ft)
- Max Span
- 37.1 m
- Width
- 18.3 m (60 ft)
- Lanes
- 3
- Daily Traffic
- 5,970
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.