SKYGAZER STREET over LOCAL DRAINAGE
0.1 MI S OF RIM RIDGE · County 035, Colorado · Built 2019 · 2 Lanes · 28 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 7 | Good |
Location
39.464917, -104.843358
This bridge is in worse condition than 28.4% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 7 years old.
Nearby Bridges
CROSS CANYON TRAIL over LOCAL DRAINAGE
Built 2019
WESTBRIDGE DRIVE over LOCAL DRAINAGE
Built 2019
CANYONSIDE BOULEVA over LOCAL DRAINAGE
Built 2019
HESS ROAD over WILDLIFE CROSSING
Built 2012
CANYONSIDE BOULEVA over NEWLIN GULCH
Built 2024
CASTLE PINES PKWY over I 25 ML
Built 2005
HESS ROAD over LIVESTOCK CROSSING
Built 2012
HAPPY CANYON ROAD over I 25 ML
Built 1965
I 25 ML over CLYDESDALE LN
Built 1999
SPIRIT TRAIL BOULE over BRANDY GULCH | BRANDY GU
Built 2021
Bridge Details
- Structure #
- CASTLEPINES-4
- Year Built
- 2019
- Length
- 26.9 m (88.3 ft)
- Max Span
- 25.1 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 28
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.