CANYONSIDE BOULEVA over NEWLIN GULCH
0.5 N OF HAPPY CANYON RD · County 035, Colorado · Built 2024 · 2 Lanes · 100 vehicles/day
Overall
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 8 | Very Good |
| Substructure | 9 | Excellent |
Location
39.45995, -104.865903
This bridge is in worse condition than 20.8% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 2 years old.
Nearby Bridges
CANYONSIDE BOULEVA over LOCAL DRAINAGE
Built 2019
WESTBRIDGE DRIVE over LOCAL DRAINAGE
Built 2019
CROSS CANYON TRAIL over LOCAL DRAINAGE
Built 2019
HAPPY CANYON ROAD over I 25 ML
Built 1965
CASTLE PINES PKWY over I 25 ML
Built 2005
HESS ROAD over WILDLIFE CROSSING
Built 2012
SKYGAZER STREET over LOCAL DRAINAGE
Built 2019
I 25 ML over CLYDESDALE LN
Built 1999
HESS ROAD over LIVESTOCK CROSSING
Built 2012
NB I25 ML over N MEADOWS PARKWAY
Built 2015
Bridge Details
- Structure #
- CASTLEPINES-5
- Year Built
- 2024
- Length
- 16.8 m (55.1 ft)
- Max Span
- 15.2 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.