CANYONSIDE BOULEVA over LOCAL DRAINAGE

JUST N OF WESTBRIDGE · County 035, Colorado · Built 2019 · 2 Lanes · 2,104 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
CASTLEPINES-1
Year Built
2019
Length
25.7 m (84.3 ft)
Max Span
23.9 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
2,104
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.