HAPPY CANYON ROAD over I 25 ML
5.1 MI N CASTLE ROCK BUS. · County 035, Colorado · Built 1965 · 2 Lanes · 6,760 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
39.449844, -104.875536
This bridge is in worse condition than 98.5% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 61 years old.
Nearby Bridges
CANYONSIDE BOULEVA over NEWLIN GULCH
Built 2024
CANYONSIDE BOULEVA over LOCAL DRAINAGE
Built 2019
WESTBRIDGE DRIVE over LOCAL DRAINAGE
Built 2019
CASTLE PINES PKWY over I 25 ML
Built 2005
CROSS CANYON TRAIL over LOCAL DRAINAGE
Built 2019
NB I25 ML over N MEADOWS PARKWAY
Built 2015
SB I25 ML over N MEADOWS PARKWAY
Built 2015
HESS ROAD over WILDLIFE CROSSING
Built 2012
SKYGAZER STREET over LOCAL DRAINAGE
Built 2019
NB US 85 ON RAMP over TERRAIN
Built 2014
Bridge Details
- Structure #
- G-17-AG
- Year Built
- 1965
- Length
- 51.6 m (169.3 ft)
- Max Span
- 25.9 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 6,760
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.