WESTBRIDGE DRIVE over LOCAL DRAINAGE

0.15 MI E of CANYONSIDE · County 035, Colorado · Built 2019 · 2 Lanes · 2,104 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
CASTLEPINES-2
Year Built
2019
Length
27.1 m (88.9 ft)
Max Span
25.1 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
2,104
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.