SPIRIT TRAIL BOULE over BRANDY GULCH | BRANDY GU

AVANTI-SPIRIT TRAIL BLVD · County 035, Colorado · Built 2021 · 3 Lanes · 6,360 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
PAR SPIRIT-0.2
Year Built
2021
Length
31.4 m (103 ft)
Max Span
29.7 m
Width
20.4 m (66.9 ft)
Lanes
3
Daily Traffic
6,360
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.