TALLANT ROAD over MISSION CREEK
0.05 MI WEST ALAMAR · County 083, California · Built 1971 · 2 Lanes · 1,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.432236, -119.726997
This bridge is in worse condition than 13.5% of bridges in County 083. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
JUNIPERO STREET over MISSION CREEK
Built 1972
DE LA VINA ST over MISSION CREEK
Built 1916
PUEBLO ST over MISSION CREEK
Built 1958
ALAMAR AVE over MISSION CREEK
Built 1930
STATE ST over MISSION CREEK
Built 1950
STATE ROUTE 225 over US HIGHWAY 101
Built 1957
STATE ROUTE 225 over UP RR & AMTRAK
Built 1984
MISSION ST over MISSION CREEK
Built 1963
US HIGHWAY 101 NB over MISSION STREET
Built 1963
US HIGHWAY 101 SB over MISSION STREET
Built 1963
Bridge Details
- Structure #
- 51C0303
- Year Built
- 1971
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.1 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,400
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.