JUNIPERO STREET over MISSION CREEK

WEST OF ALAMAR AVE · County 083, California · Built 1972 · 2 Lanes · 7,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
51C0302
Year Built
1972
Length
10.7 m (35.1 ft)
Max Span
9.5 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
7,500
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.